Skip to main content

Author: paul

A Trip Down Memory Lane: Swindon’s Virgin Cinema in the 90s

Swindon locals who grew up in the 90s likely remember the excitement around the Shaw Ridge Leisure Park cinema. It wasn’t always the Cineworld we know today. Originally opening as an MGM-branded cinema in 1991, it transformed over the years, becoming a much-loved Virgin Cinema before finally shifting to Cineworld. This article revisits the early days, showcasing how the cinema became a staple of leisure and entertainment in Swindon.

The Early MGM Days

Shaw Ridge Leisure Park’s cinema first opened its doors under MGM’s banner. Photos from the Adver archive capture the building in its early stages, under construction in the early 90s. The grand opening in 1991 brought a buzz of excitement. Locals were drawn to the idea of a big multiplex, complete with the promise of all the latest releases. MGM celebrated its opening year by featuring a young cinema-goer born at around the same time— a touching reminder of the community spirit.

Suggestion: Incorporate a nostalgic tone here, encouraging readers to reminisce about their first visit to MGM.

Virgin Cinema’s Arrival in 1995

The mid-90s saw a shift in branding across the UK. Virgin Group, led by Richard Branson, acquired the cinema, renaming it as Virgin Cinemas in 1995. This was more than a simple rebranding—it was a facelift. The lobby received a modern look, complete with an updated pick-and-mix section, a revamped bar area, and stylish decor that matched Virgin’s signature bold branding.

For Swindon’s movie-goers, these changes were exciting. The Virgin name brought a fresh, trendy vibe. Regulars of the cinema enjoyed the new seating, the colourful lobby, and the little extras like the expanded snack selection.

Suggestion: Mention any favourite movie snacks or iconic moments in the Virgin Cinema era to add a personal, nostalgic element.

Life Inside the Cinema: A Peek Behind the Scenes

Photos from the archive take us behind the scenes, offering glimpses into the projection booth and the cinema’s staff at work. The team of projectionists and cinema staff contributed to the welcoming environment. The sight of the large, spinning film reels in the projection booth was a marvel back then— a stark contrast to today’s digital projectors. Staff from that era recall the pride they felt working at Swindon’s most popular cinema, which had quickly become a landmark for locals.

In a throwback to one of the cinema’s biggest events, the premiere of Star Wars Episode One: The Phantom Menace in 1999 drew large crowds. The cinema was bustling, and the marquee out front proudly displayed the movie title, which was an event of its own.

The Move to Cineworld

As the new millennium rolled around, another change was on the horizon. Virgin Cinemas sold its sites, and Cineworld took over the Shaw Ridge Leisure Park multiplex. The core layout of the cinema remained, but Cineworld implemented further upgrades, improving seating and expanding movie options to include more global blockbusters. Cineworld’s arrival also brought loyalty programs and discounts that helped make trips to the cinema more affordable. However, for those who grew up with Virgin Cinema, it was hard not to feel nostalgic.

While Cineworld’s modern amenities and diverse movie selections have kept it popular, there’s something irreplaceable about the 90s charm of Virgin Cinema at Shaw Ridge.

Development Moves Ahead for Chippenham’s Rawlings Green Project

Plans for the Rawlings Green development, a significant new housing project in Chippenham, Wiltshire, are moving forward. Crest Nicholson Operations Ltd and Summix Ltd recently submitted the reserved matters application for phase two, a crucial milestone that brings the development closer to reality. The project, which received outline planning approval in 2021, includes detailed plans for 454 new homes, a care facility, several commercial units, and a country park covering roughly 10 hectares.

This second phase, designed with a strong emphasis on sustainable development and community integration, will offer various types of housing, suitable for a range of residents, along with essential amenities and open spaces. Wiltshire Council is expected to review these plans in the coming months, with a decision anticipated by early 2025.

Sustainable and Community-Focused Development

The Rawlings Green project is notable not only for its size but also for its alignment with the Government’s Future Homes Standard. To meet these standards, none of the new homes will include gas boilers, marking a significant step toward lower-carbon living. This move reflects a broader commitment to sustainability by the developers, who have prioritised environmentally friendly building methods and resource-efficient designs.

In their submission, the developers stated their intention to “retain and enhance” natural elements within the development area, such as mature trees, footpaths, and surrounding green spaces. By incorporating additional woodland and open areas, Crest Nicholson and Summix aim to create a living space that blends seamlessly into the Chippenham landscape.

Key Features of the Development

This stage of the Rawlings Green project features:

  • 454 Homes: A mix of housing types to cater to families, singles, and older residents.
  • Care Home: A dedicated facility with 66 beds, addressing the need for senior care in the region.
  • Commercial Units: Five commercial buildings to provide amenities and employment opportunities for residents.
  • Country Park: Spanning about 10 hectares, the park will include trails, recreational spaces, and conservation areas.

Wiltshire Council granted initial approval for the project in 2021, despite some local opposition. Over 150 letters of objection were submitted by residents and local councils, including Chippenham Town Council and Langley Burrell Parish Council. Concerns mainly focused on potential impacts on traffic, local resources, and the environmental landscape. The developers have addressed some of these concerns by designing access points, including a new railway bridge from Parsonage Way, to manage traffic flow and connect the new community effectively.

Timeline and Approval Process

As it stands, Wiltshire Council is expected to make a final decision on the phase two plans by 20 January 2025. If approved, construction could begin soon after, with the developers aiming to build an eco-conscious, community-focused neighbourhood.

The development area spans about 31.6 hectares, and its design is intentionally planned to integrate with the natural surroundings, taking advantage of the land’s natural slope towards the nearby river. With ample green spaces and an approach that respects the existing landscape, the developers hope to create a living environment that balances modern needs with ecological responsibility.

For updates, interested parties can visit Wiltshire Council’s planning portal or follow Swindon Spotlight’s coverage for further information as the project progresses.

Final Thoughts

This project promises to bring a significant boost to Chippenham by providing housing options that meet a range of needs while also adding commercial spaces and recreational facilities. By focusing on sustainable practices and prioritising local landscapes, Rawlings Green could become a key model for similar developments in Wiltshire.